Difference between revisions of "Rose-UKCA suites"

From UKCA
Line 9: Line 9:
   
 
For the initial Rose setup and instructions on using Rose on MONSooN, see [http://collab.metoffice.gov.uk/twiki/bin/view/Support/MONSooNRose this] page (requires Collaboration Twiki login).
 
For the initial Rose setup and instructions on using Rose on MONSooN, see [http://collab.metoffice.gov.uk/twiki/bin/view/Support/MONSooNRose this] page (requires Collaboration Twiki login).
  +
  +
===== UM11.5 (Test Suite) =====
  +
'''[https://code.metoffice.gov.uk/trac/roses-u/browser/b/o/3/7/5 u-bo375]'''
  +
  +
This is an upgrade of the vn11.4 suite and runs the following configurations at N96L85:<br/>
  +
* StratTrop(CheST)+GLOMAP+RADAER+Activate with ''Restartability'' (NRUN vs NRUN+CRUN), ''OpenMP'' (1 vs 2 threads) and ''Rigorous build'' tests
  +
* StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate with PE bit-reproducibility (16x8 vs 8x12 PEs) test
  +
* Offline oxidants+GLOMAP+RADAER+Activate with PE bit-reproducibility (16x8 vs 8x12 PEs) test
  +
  +
In addition, at the end (i.e. when suite ''finishes successfully'' or is ''stopped by user'') a '''trac.log''' file is now generated that contains basic information on the suite-run and status of each of the tasks. The contents of the ''trac.log'' can be directly pasted into a trac page e.g. as additional testing evidence while lodging code.
  +
  +
The main configurations carry out a 2-day simulation that requires between 15 - 20 minutes to complete on the Cray.<br/>
  +
  +
[[Using the UM11.5 test suite]]
   
 
===== UM11.4 (Test Suite) =====
 
===== UM11.4 (Test Suite) =====

Revision as of 10:31, 1 November 2019

Rose UKCA suites on MONsooN


This page describes the Rose suites with UKCA that are installed on MONsooN.

Disclaimer: The main purpose of these suites is for model development and testing with short runs. They should be considered as not suitable for Science applications.

Pre-requisites

Account on the Met Office Science Repository (MOSRS) for UM and Rose code, the PUMA Rose repository (if using puma- suites) and access to the MONSooN HPC system.
Basic knowledge about Rose and its usage with UM.

For the initial Rose setup and instructions on using Rose on MONSooN, see this page (requires Collaboration Twiki login).

UM11.5 (Test Suite)

u-bo375

This is an upgrade of the vn11.4 suite and runs the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate with Restartability (NRUN vs NRUN+CRUN), OpenMP (1 vs 2 threads) and Rigorous build tests
  • StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate with PE bit-reproducibility (16x8 vs 8x12 PEs) test
  • Offline oxidants+GLOMAP+RADAER+Activate with PE bit-reproducibility (16x8 vs 8x12 PEs) test

In addition, at the end (i.e. when suite finishes successfully or is stopped by user) a trac.log file is now generated that contains basic information on the suite-run and status of each of the tasks. The contents of the trac.log can be directly pasted into a trac page e.g. as additional testing evidence while lodging code.

The main configurations carry out a 2-day simulation that requires between 15 - 20 minutes to complete on the Cray.

Using the UM11.5 test suite

UM11.4 (Test Suite)

u-bk021

This is an upgrade of the vn11.3 suite and runs the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate with Restartability (NRUN vs NRUN+CRUN), OpenMP (1 vs 2 threads) and Rigorous build tests
  • StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate with PE bit-reproducibility (16x8 vs 8x12 PEs) test
  • Offline oxidants+GLOMAP+RADAER+Activate with PE bit-reproducibility (16x8 vs 8x12 PEs) test

In addition, at the end (i.e. when suite finishes successfully or is stopped by user) a trac.log file is now generated that contains basic information on the suite-run and status of each of the tasks. The contents of the trac.log can be directly pasted into a trac page e.g. as additional testing evidence while lodging code.

The main configurations carry out a 2-day simulation that requires between 15 - 20 minutes to complete on the Cray.

Using the UM11.4 test suite

UM11.3 (Test Suite)

u-bg563

This is an upgrade of the vn11.2 suite and runs the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate with Restartability (NRUN vs NRUN+CRUN), OpenMP (1 vs 2 threads) and Rigorous build tests
  • StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate with PE bit-reproducibility (16x8 vs 8x12 PEs) test
  • Offline oxidants+GLOMAP+RADAER+Activate with PE bit-reproducibility (16x8 vs 8x12 PEs) test

At vn11.3 an additional test with 'Rigorous for the Strattrop configuration has been introduced. This builds the executable with low optimisation, many compiler checks and runs a 3-hour simulation, compared against the reference.

The main configurations carry out a 2-day simulation that requires between 15 - 20 minutes to complete on the Cray.

Using the UM11.3 test suite

UM11.2 (Test Suite)

u-be133

This is an upgrade of the vn11.1 suite and continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants and Strattrop-Columnar jobs include a bit-reproducibility test (16x8 vs 8x12 PEs), while the Strat+trop job includes an OpenMP (1 thread vs 2 threads) and a Restartability (NRUN vs NRUN+CRUN) test
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM11.2 test suite

UM11.1 (Test Suite)

u-az274

This is an upgrade of the vn11.0 suite and continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants and Strattrop-Columnar jobs include a bit-reproducibility test (16x8 vs 8x12 PEs), while the Strat+trop job includes an OpenMP (1 thread vs 2 threads) and a Restartability (NRUN vs NRUN+CRUN) test
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM11.1 test suite

UM11.0 (Test Suite)

u-av613

This is an upgrade of the vn10.9 suite and continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants and Strattrop-Columnar jobs include a bit-reproducibility test (16x8 vs 8x12 PEs), while the Strat+trop job includes an OpenMP (1 thread vs 2 threads) and a Restartability (NRUN vs NRUN+CRUN) test
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM11.0 test suite

UM10.9 (Test Suite)

u-al223

This is an upgrade from previous versions of the suite and continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants and Strattrop-Columnar jobs include bit-reproducibility between 16x8 vs 8x12 PEs, while the Strat+trop job includes a NRUN vs NRUN+CRUN
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM10.9 test suite

UM10.8 (Test Suite)

MONSooN: puma-aa438
MetO: mi-at557 This is an upgrade from previous versions of the suite and continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants job includes bit-reproducibility between 16x8 vs 8x12 PEs (TEST_PE), while the Strat+trop job includes a NRUN vs NRUN+CRUN (CRUN_TEST)
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM10.8 test suite

UM10.7 (Test Suite)

MONSooN: puma-aa428
MetO: mi-ar330 This is an upgrade from the UM10.6 suite a test suite continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants job includes bit-reproducibility between 16x8 vs 8x12 PEs (TEST_PE), while the Strat+trop job includes a NRUN vs NRUN+CRUN (CRUN_TEST)
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM10.7 test suite

UM10.6 (Test Suite)

MONSooN: puma-aa405
MetO: mi-ap240 This is an upgrade from the UM10.5 suite a test suite continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants job includes bit-reproducibility between 16x8 vs 8x12 PEs (TEST_PE), while the Strat+trop job includes a NRUN vs NRUN+CRUN (CRUN_TEST)
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM10.6 test suite