Difference between revisions of "Rose-UKCA suites"

From UKCA
Line 10: Line 10:
 
For the initial Rose setup and instructions on using Rose on MONSooN, see [http://collab.metoffice.gov.uk/twiki/bin/view/Support/MONSooNRose this] page (requires Collaboration Twiki login).
 
For the initial Rose setup and instructions on using Rose on MONSooN, see [http://collab.metoffice.gov.uk/twiki/bin/view/Support/MONSooNRose this] page (requires Collaboration Twiki login).
   
===== UM10.2 =====
+
===== UM11.0 (Test Suite) =====
  +
'''[https://code.metoffice.gov.uk/trac/roses-u/browser/a/v/6/1/3 u-av613]'''
'''[https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/2/3/7/trunk puma-aa237]:''' This is an UKCA StratTrop/CheST Chemistry +GLOMAP suite at N96L85 resolution. The suite is derived from the UM Global Atmosphere development suite [https://code.metoffice.gov.uk/trac/GA/wiki/ticket/136/mi-ah615 mi-ah615], but using the ''StraTrop or CheST'' scheme instead of ''Offline oxidants''.<br/>
 
The suite is set up to archive model output (to the MASS tape drive) and submit the next segment, so it can be used for performing long simulations.
 
 
===== UM10.3 =====
 
'''[https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/2/6/2/trunk puma-aa262]:''' This is a test suite based on the UKCA configurations in the UM trunk and can simultaneously run the following configurations at N96L85:<br/>
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate with two PE configurations
 
 
Both the configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray. The CheST Configuration uses 16x8 PEs, while the Offline configuration uses 16x8 and 8x12 PEs.
 
   
 
This is an upgrade of the vn10.9 suite and continues to run the following configurations at N96L85:<br/>
[[Using the UM10.3 Test Suite]]
 
 
===== UM10.4 (Test Suite) =====
 
'''[https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/3/2/2/trunk puma-aa322]:''' This is a test suite based on the UKCA configurations in the UM trunk and can simultaneously run the following configurations at N96L85:<br/>
 
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
 
* StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate
   
The Offline oxidants job includes tests to compare between 16x8 vs 8x12 PE configurations (TEST_PE), as well as between runs composed of different segments (NRUN-CRUN, CRUN_TEST)<br/>
+
The Offline oxidants and Strattrop-Columnar jobs include bit-reproducibility between 16x8 vs 8x12 PEs, while the Strat+trop job includes a NRUN vs NRUN+CRUN <br/>
 
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
 
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
A significant change from the UM10.3 suite is that all the tasks are run from the same base app (um), making use of ''optional configurations : ROSE_APP_OPT_CONF_KEYS'' in the suite.rc.
 
   
[[Using the UM10.4 test suite]]
+
[[Using the UM11.0 test suite]]
   
  +
===== UM10.9 (Test Suite) =====
  +
'''[https://code.metoffice.gov.uk/trac/roses-u/browser/a/l/2/2/3 u-al223]'''
   
 
This is an upgrade from previous versions of the suite and continues to run the following configurations at N96L85:<br/>
===== UM10.5 (Test Suite) =====
 
'''[https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/3/5/8/trunk puma-aa358]:''' This is a simple upgrade from the UM10.4 suite a test suite continues to run the following configurations at N96L85:<br/>
 
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
  +
* StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate
   
AS for UM10.4, the Offline oxidants job includes bit-reproducibility between 16x8 vs 8x12 PEs (TEST_PE) as well as the NRUN vs CRUN, CRUN_TEST)<br/>
+
The Offline oxidants and Strattrop-Columnar jobs include bit-reproducibility between 16x8 vs 8x12 PEs, while the Strat+trop job includes a NRUN vs NRUN+CRUN <br/>
 
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
 
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
   
[[Using the UM10.5 test suite]]
+
[[Using the UM10.9 test suite]]
   
===== UM10.6 (Test Suite) =====
+
===== UM10.8 (Test Suite) =====
'''MONSooN: [https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/4/0/5/trunk puma-aa405]''' <br/>
+
'''MONSooN: [https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/4/3/8/trunk puma-aa438]''' <br/>
'''MetO: [http://fcm1/projects/roses_mi/intertrac/source:/a/p/2/4/0/trunk mi-ap240]'''
+
'''MetO: [http://fcm1/projects/roses_mi/intertrac/source:/a/t/5/5/7/trunk mi-at557]'''
This is an upgrade from the UM10.5 suite a test suite continues to run the following configurations at N96L85:<br/>
+
This is an upgrade from previous versions of the suite and continues to run the following configurations at N96L85:<br/>
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate
Line 55: Line 46:
 
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
 
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
   
[[Using the UM10.6 test suite]]
+
[[Using the UM10.8 test suite]]
   
 
===== UM10.7 (Test Suite) =====
 
===== UM10.7 (Test Suite) =====
Line 69: Line 60:
 
[[Using the UM10.7 test suite]]
 
[[Using the UM10.7 test suite]]
   
===== UM10.8 (Test Suite) =====
+
===== UM10.6 (Test Suite) =====
'''MONSooN: [https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/4/3/8/trunk puma-aa438]''' <br/>
+
'''MONSooN: [https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/4/0/5/trunk puma-aa405]''' <br/>
'''MetO: [http://fcm1/projects/roses_mi/intertrac/source:/a/t/5/5/7/trunk mi-at557]'''
+
'''MetO: [http://fcm1/projects/roses_mi/intertrac/source:/a/p/2/4/0/trunk mi-ap240]'''
This is an upgrade from previous versions of the suite and continues to run the following configurations at N96L85:<br/>
+
This is an upgrade from the UM10.5 suite a test suite continues to run the following configurations at N96L85:<br/>
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate
Line 79: Line 70:
 
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
 
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
   
[[Using the UM10.8 test suite]]
+
[[Using the UM10.6 test suite]]
   
===== UM10.9 (Test Suite) =====
+
===== UM10.5 (Test Suite) =====
'''[https://code.metoffice.gov.uk/trac/roses-u/browser/a/l/2/2/3 u-al223]'''
+
'''[https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/3/5/8/trunk puma-aa358]:''' This is a simple upgrade from the UM10.4 suite a test suite continues to run the following configurations at N96L85:<br/>
  +
* StratTrop(CheST)+GLOMAP+RADAER+Activate
  +
* Offline oxidants+GLOMAP+RADAER+Activate
   
  +
AS for UM10.4, the Offline oxidants job includes bit-reproducibility between 16x8 vs 8x12 PEs (TEST_PE) as well as the NRUN vs CRUN, CRUN_TEST)<br/>
This is an upgrade from previous versions of the suite and continues to run the following configurations at N96L85:<br/>
 
  +
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
  +
  +
[[Using the UM10.5 test suite]]
  +
 
===== UM10.4 (Test Suite) =====
 
'''[https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/3/2/2/trunk puma-aa322]:''' This is a test suite based on the UKCA configurations in the UM trunk and can simultaneously run the following configurations at N96L85:<br/>
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
* StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate
 
 
* Offline oxidants+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate
   
The Offline oxidants and Strattrop-Columnar jobs include bit-reproducibility between 16x8 vs 8x12 PEs, while the Strat+trop job includes a NRUN vs NRUN+CRUN <br/>
+
The Offline oxidants job includes tests to compare between 16x8 vs 8x12 PE configurations (TEST_PE), as well as between runs composed of different segments (NRUN-CRUN, CRUN_TEST)<br/>
 
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
 
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.<br/>
 
A significant change from the UM10.3 suite is that all the tasks are run from the same base app (um), making use of ''optional configurations : ROSE_APP_OPT_CONF_KEYS'' in the suite.rc.
   
[[Using the UM10.9 test suite]]
+
[[Using the UM10.4 test suite]]
  +
 
===== UM10.3 =====
 
'''[https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/2/6/2/trunk puma-aa262]:''' This is a test suite based on the UKCA configurations in the UM trunk and can simultaneously run the following configurations at N96L85:<br/>
 
* StratTrop(CheST)+GLOMAP+RADAER+Activate
 
* Offline oxidants+GLOMAP+RADAER+Activate with two PE configurations
  +
 
Both the configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray. The CheST Configuration uses 16x8 PEs, while the Offline configuration uses 16x8 and 8x12 PEs.
  +
 
[[Using the UM10.3 Test Suite]]
  +
  +
===== UM10.2 =====
 
'''[https://puma.nerc.ac.uk/trac/roses_puma/browser/a/a/2/3/7/trunk puma-aa237]:''' This is an UKCA StratTrop/CheST Chemistry +GLOMAP suite at N96L85 resolution. The suite is derived from the UM Global Atmosphere development suite [https://code.metoffice.gov.uk/trac/GA/wiki/ticket/136/mi-ah615 mi-ah615], but using the ''StraTrop or CheST'' scheme instead of ''Offline oxidants''.<br/>
 
The suite is set up to archive model output (to the MASS tape drive) and submit the next segment, so it can be used for performing long simulations.

Revision as of 14:53, 6 March 2018

Rose UKCA suites on MONsooN


This page describes the Rose suites with UKCA that are installed on MONsooN.

Disclaimer: The main purpose of these suites is for model development and overall assessment of performance. Until the suites are assessed properly and released via the UKCA Release Jobs page, they should be considered as not suitable for Science applications.

Pre-requisites

Account for the PUMA Rose repository and access to the MONSooN HPC system.
Basic knowledge about Rose and its usage with UM.

For the initial Rose setup and instructions on using Rose on MONSooN, see this page (requires Collaboration Twiki login).

UM11.0 (Test Suite)

u-av613

This is an upgrade of the vn10.9 suite and continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants and Strattrop-Columnar jobs include bit-reproducibility between 16x8 vs 8x12 PEs, while the Strat+trop job includes a NRUN vs NRUN+CRUN
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM11.0 test suite

UM10.9 (Test Suite)

u-al223

This is an upgrade from previous versions of the suite and continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • StratTrop(CheST)-Columnar+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants and Strattrop-Columnar jobs include bit-reproducibility between 16x8 vs 8x12 PEs, while the Strat+trop job includes a NRUN vs NRUN+CRUN
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM10.9 test suite

UM10.8 (Test Suite)

MONSooN: puma-aa438
MetO: mi-at557 This is an upgrade from previous versions of the suite and continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants job includes bit-reproducibility between 16x8 vs 8x12 PEs (TEST_PE), while the Strat+trop job includes a NRUN vs NRUN+CRUN (CRUN_TEST)
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM10.8 test suite

UM10.7 (Test Suite)

MONSooN: puma-aa428
MetO: mi-ar330 This is an upgrade from the UM10.6 suite a test suite continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants job includes bit-reproducibility between 16x8 vs 8x12 PEs (TEST_PE), while the Strat+trop job includes a NRUN vs NRUN+CRUN (CRUN_TEST)
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM10.7 test suite

UM10.6 (Test Suite)

MONSooN: puma-aa405
MetO: mi-ap240 This is an upgrade from the UM10.5 suite a test suite continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants job includes bit-reproducibility between 16x8 vs 8x12 PEs (TEST_PE), while the Strat+trop job includes a NRUN vs NRUN+CRUN (CRUN_TEST)
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM10.6 test suite

UM10.5 (Test Suite)

puma-aa358: This is a simple upgrade from the UM10.4 suite a test suite continues to run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

AS for UM10.4, the Offline oxidants job includes bit-reproducibility between 16x8 vs 8x12 PEs (TEST_PE) as well as the NRUN vs CRUN, CRUN_TEST)
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.

Using the UM10.5 test suite

UM10.4 (Test Suite)

puma-aa322: This is a test suite based on the UKCA configurations in the UM trunk and can simultaneously run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate

The Offline oxidants job includes tests to compare between 16x8 vs 8x12 PE configurations (TEST_PE), as well as between runs composed of different segments (NRUN-CRUN, CRUN_TEST)
The main configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray.
A significant change from the UM10.3 suite is that all the tasks are run from the same base app (um), making use of optional configurations : ROSE_APP_OPT_CONF_KEYS in the suite.rc.

Using the UM10.4 test suite

UM10.3

puma-aa262: This is a test suite based on the UKCA configurations in the UM trunk and can simultaneously run the following configurations at N96L85:

  • StratTrop(CheST)+GLOMAP+RADAER+Activate
  • Offline oxidants+GLOMAP+RADAER+Activate with two PE configurations

Both the configurations carry out a 2-day simulation that requires between 10 - 15 minutes to complete on the Cray. The CheST Configuration uses 16x8 PEs, while the Offline configuration uses 16x8 and 8x12 PEs.

Using the UM10.3 Test Suite

UM10.2

puma-aa237: This is an UKCA StratTrop/CheST Chemistry +GLOMAP suite at N96L85 resolution. The suite is derived from the UM Global Atmosphere development suite mi-ah615, but using the StraTrop or CheST scheme instead of Offline oxidants.
The suite is set up to archive model output (to the MASS tape drive) and submit the next segment, so it can be used for performing long simulations.